Insulated Tuhti WSE halls

Content of the delivery

Partial delivery without windows and doors (standard content). Fire rating P3.

STEEL FRAMES

  • structure: three-pin portal frame/li>
  • roof angle 15°
  • girder boxes are dip-painted (interior surfaces are also painted)
  • in WSE 11 and 14, the end frames have 2 columns
  • 3 columns in WSE 16
  • frame fastening bolts, foundation fastening bolts

ROOF PURLINS

  • Z 200 B steel purlin
  • purlin fastening screws

GASKET TAPE

  • between the roofing element and purlin and between the wall element and girder box

WALL ELEMENTS

  • Classic 200, thickness 125 mm, polyester, U value = 0.25 W/m²K
  • colour options (standard: single colour per wall): RR20 white, RR21 light grey, RR29 red, RR30 light brown and RR34 light blue, interior surface polyester (wall colours as options)

ROOF ELEMENTS

  • Classic 200, thickness 150 mm, Prelag Nova, U value = 0.20 W/m²K (machined seam)
  • colour options: RR20 white, RR22 grey, RR23 dark grey and RR29 red, interior surface polyester (wall colours as options)

FLASHINGS

  • flashings for exterior corners and upright seams, plinths, eaves, outer and inner corners of walls/roofs, and outer and inner flashings for the roof ridge

FASTENERS

  • fasteners and fastening screws for wall and roof elements and flashings

DOOR OPENINGS

  • two openings for doors, 4.5 x 4.5 m each, including door jambs

DRAWINGS

  • floor plans, facade plans, cutaway drawings (excluding the site plan and foundation plan)

INSTALLATION INSTRUCTIONS

  • foundation bolt position drawings, assembly instructions

MATERIALS

  • Weckman Steel Oy performs the material calculations and scheduling for the material deliveries relating to the order.

ADDITIONAL DELIVERIES

  • any changes and additional deliveries are defined in the delivery contract

SPECIAL HALLS

  • prices set by Weckman Steel Oy
  • for special halls, an advance fee of 15% is charged

DELIVERY

  • price set at the factory (the frame and insulating elements form different suppliers)
  • transport (overall transport for partial deliveries)
  • if the foundation fasteners are delivered in advance, the customer pays for the transport

CUSTOMER’S RESPONSIBILITY INCLUDES

  • Procuring/hiring an installation team
  • Hiring a worksite manager and principal designer, as required by law
  • Ordering a site and foundation plan from the principal designer
  • Acquiring polyurethane, expanding foam, seam adhesive and sealing paste used for joint sealing and gasket tape and fasteners for the plinth flashing
  • Further instructions in the installation instructions
  • Complying with storage instructions delivered with the package. Note! The factory is not responsible for damages arising during storage and installation./li>