{"id":52472,"date":"2026-09-22T12:01:36","date_gmt":"2026-09-22T09:01:36","guid":{"rendered":"https:\/\/www.weckmansteel.fi\/?p=52472"},"modified":"2026-09-22T12:01:40","modified_gmt":"2026-09-22T09:01:40","slug":"new-hall-ready-for-winter-easy-and-flexible-with-leasing","status":"publish","type":"post","link":"https:\/\/www.weckmansteel.fi\/en\/new-hall-ready-for-winter-easy-and-flexible-with-leasing\/","title":{"rendered":"New Hall Ready for Winter \u2013 Easy and Flexible with Leasing"},"content":{"rendered":"<h2>Hall Up Quickly Without Large Initial Investments<\/h2>\n<p class=\"lead\">Need storage or service facilities for the coming winter? You can acquire a Weckman Steel building through grenke leasing, saving your company&#8217;s capital for other investments. The financing solution enables the building to be completed on time while payments are spread into predictable monthly installments.  <\/p>\n<p>When the foundations are laid while the ground is still unfrozen, the hall can be completed during winter. This way, the new space is ready for use promptly. <\/p>\n<h2>Winter Construction Takes Advantage of the Quieter Season<\/h2>\n<p>Building a hall in winter may sound challenging, but it offers many advantages compared to spring or summer construction. During the winter season, demand in the construction industry is often lower, which means shorter delivery times, better availability of contractors, and potentially more competitive prices. Additionally, applying for a building permit in the fall enables construction to begin immediately in winter without delays.  <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-45890 size-large\" src=\"https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-1024x639.jpg\" alt=\"\" width=\"1020\" height=\"637\" srcset=\"https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-1024x639.jpg 1024w, https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-900x562.jpg 900w, https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-300x187.jpg 300w, https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-768x479.jpg 768w, https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-1536x959.jpg 1536w, https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/11\/Hallin-rakentaminen-talvella-2048x1278.jpg 2048w\" sizes=\"auto, (max-width: 1020px) 100vw, 1020px\" \/><\/p>\n<h2>Leasing Benefits for Your Business<\/h2>\n<ul>\n<li>Capital remains available for other business operations<\/li>\n<li>Clear, fixed monthly payment<\/li>\n<li>The application process is fast and simple<\/li>\n<li>In leasing, the leased asset serves as the primary collateral for financing<\/li>\n<li>Leasing payments are fully tax-deductible for the company.<\/li>\n<li>Leasing payments are off-balance-sheet liabilities in Finnish accounting and do not burden the company&#8217;s cash flow.<\/li>\n<\/ul>\n<p>The prerequisite for obtaining leasing is that the company&#8217;s financial situation is sound and there are no payment defaults.<\/p>\n<h2>Now Is the Right Time to Act<\/h2>\n<p>Although fall is behind us, a hall project can still begin. When the foundations are laid before the ground freezes, a Weckman Steel hall can be completed and ready for use during the winter season. Whether it&#8217;s a warehouse, equipment shelter, or maintenance facility, we deliver the complete package from design to installation \u2013 with one contract and on the agreed schedule.  <\/p>\n<p><strong>Request More Information and Receive a Quote for grenke Leasing<\/strong><\/p>\n<a href=\"https:\/\/www.weckmansteel.fi\/en\/buildings\/request-for-quote\/\" class=\"button primary\" >\n\t\t<span>Request a Quote<\/span>\n\t<\/a>\n\n<a href=\"https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2023\/04\/Weckman_esite_terasrunkoiset_hallit_2sivuinen_LowRes_230419.pdf\" class=\"button secondary\" >\n\t\t<span>Download Hall Brochure<\/span>\n\t<\/a>\n\n<a href=\"https:\/\/www.weckmansteel.fi\/en\/buildings\/selecting-and-building-a-steel-hall\/\" class=\"button secondary\" >\n\t\t<span>Information About Hall Construction<\/span>\n\t<\/a>\n\n\t<div id=\"gap-737406520\" class=\"gap-element clearfix\" style=\"display:block; height:auto;\">\n\t\t\n<style>\n#gap-737406520 {\n  padding-top: 30px;\n}\n<\/style>\n\t<\/div>\n\t\n<h2>Our Leasing Partner grenke Frees Your Business to Grow<\/h2>\n<p>Grenke tailors a financing and service solution that supports your company&#8217;s growth, giving your business access to a modern and functional hall with one contract and a fixed monthly price.<\/p>\n<p>Grenke owns the leased asset for the duration of the contract and invoices a fixed rental fee for its use. After the contract period, you agree on the ownership of the hall. <\/p>\n<p>Grenke is backed by a German financial company with its own banking operations, providing security for your growth. Grenke&#8217;s extensive partner network in 33 countries and over 40 years of expertise in lease financing bring insight to smart financing for your growth. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-46019\" src=\"https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/09\/GRENKE_Logo_Blackpng-1-300x88.png\" alt=\"\" width=\"200\" height=\"59\" srcset=\"https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/09\/GRENKE_Logo_Blackpng-1-300x88.png 300w, https:\/\/www.weckmansteel.fi\/wp-content\/uploads\/2025\/09\/GRENKE_Logo_Blackpng-1.png 474w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/p>\n<a href=\"https:\/\/www.grenke.fi\/tuotteet\/\" target=\"_blank\" class=\"button secondary\" rel=\"noopener\">\n\t\t<span>Explore Grenke Leasing Solution<\/span>\n\t<\/a>\n\n","protected":false},"excerpt":{"rendered":"<p>Hall Up Quickly Without Large Initial Investments Need storage or service facilities for the coming winter? You can acquire a Weckman Steel building through grenke leasing, saving your company&#8217;s capital for other investments. The financing solution enables the building to be completed on time while payments are spread into predictable monthly installments. When the foundations [&#8230;]\n","protected":false},"author":28,"featured_media":10659,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[66,548],"tags":[],"class_list":["post-52472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hall-news","category-information-about-halls"],"_links":{"self":[{"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/posts\/52472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/comments?post=52472"}],"version-history":[{"count":3,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/posts\/52472\/revisions"}],"predecessor-version":[{"id":54703,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/posts\/52472\/revisions\/54703"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/media\/10659"}],"wp:attachment":[{"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/media?parent=52472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/categories?post=52472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.weckmansteel.fi\/en\/wp-json\/wp\/v2\/tags?post=52472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}