Weckman Progantti Acoustic Pro
standing seam roof

Standing seam roof Progantti Acoustic Pro – a new level of silence

The new Progantti Acoustic Pro is a standing seam panel with a factory-integrated sound-dampening layer that complements the roof’s anti-condensation protection. It is a technically and visually finished roofing panel that reduces noise from the roof, improving living comfort and protecting structures from moisture – for decades to come.

Steel thicknesses 0.5 mm and 0.6 mm.

Available in quality grades Premium 50 and Standard 40.

Request a Quote Contact an expert

Pine Green RR11, Pebble Gray RR21, Mountain Gray RR23, Cottage Red RR29, Walnut Brown RR32, Nordic Night Black RR33, Tile Red RR750.

Impressive and High-Quality Weckman Progantti Acoustic Pro Standing Seam Roof

Quieter Roof

The acoustic layer dampens noise from rain and wind as well as thermal expansion.

Condensation Protection as Standard

Factory-installed supplementary condensation protection binds moisture and protects substructures.

Clean Choice

Antibacterial and non-molding material that prevents microbial growth and keeps the roof healthy.

Affordable and Durable

Easy to maintain and long-lasting.

Finished and Reliable

Progantti’s advanced standing seam structure, easy to install.

Watertight Even on Low-Pitch Roofs

The seam structure ensures watertightness even at 1:8 roof pitch without additional sealants.

Wide Selection

Multiple profile, color, and coating options as well as material thicknesses.

Lower Carbon Footprint

Lower carbon footprint in manufacturing. Manufactured using solar energy.

Progantti Acoustic Pro.

For Quieter Living

The Acoustic Pro layer reduces noise transmitted through the roof. The drumming of rain and wind-generated noise are dampened, increasing living comfort in all weather conditions.

Progantti Acoustic Prossa on ääntä vaimentava kerros.

Acoustic Dampening Felt Pre-Integrated

The dampening felt factory-installed on the underside of the roofing panel serves as sound dampening and also as supplementary condensation protection together with the underlayment structure, protecting the roof structures.

Structural Advantages of Progantti

The Weckman side fastening allows free thermal expansion of the roofing material, reducing buckling and noise. The seam structure is watertight, and the roof ventilates according to regulations even in cold weather.

Ecological Choice

Available materials include SSAB Zero (nearly fossil-free from recycled material) and SSAB GreenCoat®. Weckman’s sheet metal products are extensively manufactured using solar energy.

Weckman Progantti Acoustic Pro is manufactured using solar energy

70-80% of Weckman’s coated sheet metal products are manufactured in an environmentally responsible manner. SSAB GreenCoat® steel and Arcelor Mittal’s environmentally friendly products are part of Weckman Steel’s range. In the future, Weckman sheet metal will utilize fossil-free steel. Fossil-free steel production will reduce Finland’s carbon dioxide emissions by 7%.

Read more

Technical Information and Roof Accessories

The functionality of Weckman Progantti Acoustic Pro is based on the Progantti profile’s dimensions and structure, factory-installed sound dampening, and supplementary condensation protection.

Weckman Progantti Acoustic Pro

Project and structural design affect the functionality of the overall solution (underlayment, ventilation, insulation). Always follow Progant's installation instructions and site-specific plan. Installation instructions can be found in the Downloads section.

Weckman Progantti Acoustic Pro

Nominal useful width

475 mm

Overall width

505 mm

Minimum length

1500 mm

Maximum length

15500 mm

Profile height

30 mm

Raw material

0,5 or 0,6 mm structural steel

Steel grade

S280GD+Z

Fire class

BROOF (RakMk E1)

Minimum recommended roof pitch

1:8

Rib division

300 mm

Sound attenuation

Integrated, sound-absorbing structure

Condensation control

Mechanically installed additional condensation protection

Hygiene

Antibacterial and mold-resistant material

Manufacturing

Factory-installed, uniform quality

 

Dimensions according to SFS-EN 508-1 tolerances

Project and structural design affect the functionality of the overall solution (underlayment, ventilation, insulation). Always follow Progant's installation instructions and site-specific plan. Installation instructions can be found in the Downloads section.

Standard colors:
Pine Green RR11, Pebble Gray RR21, Mountain Gray RR23, Cottage Red RR29, Walnut Brown RR32, Nordic Night Black RR33, Tile Red RR750.

 

ONLY FROM WECKMAN

The WECKMAN side bracket solution allows free thermal expansion of the roofing material and reduces roof sheet bulging and noise.

The WECKMAN ventilation spring ensures adequate roof ventilation in the Weckman ridge structure even in cold weather. Moisture is removed through the ridge without condensing on the underside of the roof, thus minimizing the risk of damage to structures under the water roof.

Installation accessories for Weckman Progantti roof

Guaranteed durability and safety

Finish your Weckman roof with an impressive and practical drainage system. Trough gutters and gutter pipes are manufactured of hot galvanised steel, which is Pural-coated on both sides. The benefits of the coating are excellent corrosion resistance, good cleanability and durable appearance. Standard colours: white, red, dark grey, dark brown and black .

DIMENSIONS

Down pipe

Down pipe set for 3.0-metre eaves, eaves-heights of over 3 metres with extension parts.

Trough gutter

Standard length

Standard length Standard length 3.0 m, 4.0 m or 5.0 m. Outer bracket and overlap piece as standard.

Safe and durable Weckman roof safety accessories

Wall ladders guarantee safe entry onto the roof. A roof bridge ensures a safe passage on the roof in connection with, e.g., chimney sweeping, snow dropping, antenna installations and other tasks on the roof. Snow breakers are designed to prevent damage caused by snow dropping and to protect the roof coating. All roof safety accessories are reliable and high-quality Finnish products.

Ladders

Weckman ladders are made of hot galvanised oval tubes without weldings. The steps are round tubes. Wall ladders come in powder-coated or galvanised styles and roof ladders are only available powder-coated.Standard colours for roof and wall ladders: white, red, dark grey, dark brown and black.

ROOF LADDER

Standard lengths 1,2m, 2,7m, 3,3m, 4,2m, 4,5m, 5,4m, 6m, 6,6m, 7,5m, 8,4m. The ladder set includes the ladder frame and wall mounts.

WALL LADDER

Standard lengths 1,2m, 2,7m, 3,3m, 4,2m, 4,5m, 5,4m, 6m, 6,6m, 7,5m, 8,4m. The ladder set includes upper arcs for the ladder frame and wall mounts (for an eaves width of 85–100 cm).

SAFETY LADDER

1,2m, 2,7m, 3,3m, 4,2m, 4,5m, 5,4m, 6m, 6,6m, 7,5m, 8,4m. Includes the ladder frame and wall mounts.

Roof bridge

A roof bridge can also be used for the construction of work platforms and stairs on the roof. Weckman roof bridges are safe, have a snow permeation capacity of over 50% and are classified as class 2, allowing the fastening of safety ropes. The roof bridges are powder coated. Roof profile-specific roof mounts. Standard colours: dark grey, red, dark brown, black, tile red.

ROOF BRIDGE

Standard lengths 1.21 m (3 roof mounts), 2.47 m (3 roof mounts) and 2.97 m (4 roof mounts).

Snow breaker

In Finnish conditions, snow breakers are necessary where people pass by.Weckman tube snow breakers are made of hot galvanised steel.The snow breaker is delivered either galvanised or powder-coated.Two oval tubes, four roof mounts according to the roof sheet.Standard colours: dark grey, red, dark brown, black, tile red.

SNOW BREAKER

3000 mm

Weckman quality is ensured by manufacturing according to the ISO9001 quality management system. You can also recognize Weckman quality by the CE marking, as all our steel products meet the requirements of standards SFS-EN 14783:2006 and SFS-EN 1090-1:2009+A1:2011. Every one of our employees has internalized our goal of keeping the quality of work high and error-free.

Weckman Premium 50

Weckman Standard 40

Weckman Progantti Installation